About us

What we doOur credentials How it worksWho it's for

Insights

BlogsRE glossary

More

Start free trial Watch product demo Email us WhatsApp Book a live demo Sign in

Blogs

Delay now has a price list

· 8 min read · Constructs

Missing a connectivity milestone used to mean losing connectivity. Since August 2026 it means paying to keep it — per MW, per day, at a rate that climbs.

Group captive turns on two numbers

· 7 min read · Constructs

26% of the ownership, 51% of the generation — and since the 2026 amendment, both counted across the plant rather than shareholder by shareholder.

100 MW of firm power needs about 300 MW built

· 8 min read · Constructs

FDRE and RTC contract a shape, not a quantity. Holding a firm line with variable sources takes roughly two and a half to three and a half times the contracted capacity.

Reading a tender as a set of constraints

· 7 min read · Method

Sixty pages, about five numbers that fix your configuration. What to extract, in what order, before opening a model at all.

How a tariff is built, from capex to rupees per unit

· 8 min read · Arithmetic

The five-link chain from project cost to rupees per unit, walked end to end — and why a percent of generation is worth more than a percent of capex.

Curtailment means four different things

· 6 min read · Diagnostics

Inverter clipping, an evacuation cap, a grid instruction and contractual curtailment. Same word, four causes, four owners — only one is anyone’s fault.

P50, P90, and which one belongs in which number

· 6 min read · Statistics

P50 sizes the tariff you bid. P90 sizes the debt the lender will lend. Using one where the other belongs is the quiet error in a first bid model.

CUF, PLF and availability are three different numbers

· 6 min read · Measures

Three percentages, three denominators, three different contractual consequences. The same plant scores 24%, 28% and 97% at the same time.

A project has a configuration, not a size

· 7 min read · Vocabulary

“100 MW solar” is a procurement label, not a design. The design is six numbers, and each one moves generation, cost and tariff independently.

Looking for the vocabulary instead? The renewable energy glossary defines every term the model uses.

WhatsApp